Quick Answer: MSEDCL Abhay Yojana 2026-27 waives 100% of the interest and delayed payment charges on old electricity bills for Maharashtra consumers whose supply was permanently disconnected on or before 31 March 2026. Pay the remaining principal in one go by 15 December 2026 and you also get 10% to 20% off the principal. The scheme runs from 6 November 2026 to 15 January 2027, and applications are made on MSEDCL’s official portal — not through any agent. Agriculture consumers and public water supply schemes are excluded.

If your electricity connection in Maharashtra was cut years ago over unpaid bills, the amount you owe today is probably far bigger than the bill you originally missed. Interest and late fees keep piling up long after the supply is gone, and for many households the total becomes impossible to clear. MSEDCL Abhay Yojana 2026-27 is Mahavitaran’s answer to that problem: a one-time amnesty scheme that wipes out the entire interest and late-fee portion of the arrears, and even cuts the principal itself if you settle in one payment before 15 December 2026.
This is not a discount on your current monthly bill, and it is not for everyone. It is aimed squarely at disconnected consumers — homes, shops and factories whose supply was permanently cut on or before 31 March 2026. If your connection is live and you simply have an overdue bill, this scheme does not cover you. This guide explains who is eligible, exactly how much is waived, the rebate on the principal, the instalment option, and how to apply on the official portal.
One thing to get straight first: this is a different scheme from the Maharashtra traffic-challan Abhay Yojana, which gives a discount on pending traffic fines. Same name, different department, different bills. If you are looking for the traffic-fine scheme, see our Maharashtra e-challan amnesty guide. Everything below is about electricity bills under MSEDCL (Mahavitaran).
Contents
- MSEDCL Abhay Yojana 2026-27: what the scheme offers
- Who is eligible — and who is not
- How much you save: the rebate table
- Lump sum or instalments: which is better
- How to apply on the official portal
- What happens after you apply
- The 5% prepaid smart meter concession — read this first
- Common mistakes to avoid
- FAQs
- Sources
MSEDCL Abhay Yojana 2026-27: what the scheme offers
MSEDCL — the Maharashtra State Electricity Distribution Company, better known as Mahavitaran — launched the Abhay Yojana 2026-27 on 5 November 2026 at its Prakashgad headquarters in Mumbai. The scheme is set out in MSEDCL’s B&A Circular No. 09/2026, dated 4 November 2026, and it runs from 6 November 2026 to 15 January 2027.
The reason for the scheme is the sheer scale of the problem. According to MSEDCL figures reported by Navbharat, about 34.86 lakh permanently disconnected non-agricultural consumers owe roughly ₹7,650 crore, of which ₹2,092 crore is interest and delayed payment charges that the scheme will waive. Another 2.60 lakh temporarily disconnected consumers owe ₹488.78 crore, with ₹163.93 crore in interest to be waived. These are old, stuck dues — the kind that neither the consumer nor the company can recover under normal billing.
What the scheme gives an eligible consumer:
- 100% waiver of delayed payment charges (DPC) on the arrears.
- 100% waiver of interest arrears, including interest that built up from the date of permanent disconnection right up to the date you apply.
- Waiver of demand/fixed charges for the period between temporary disconnection and permanent disconnection.
- Up to 20% off the principal itself — but only if you pay the full principal in one lump sum by 15 December 2026 (the early-bird rebate, explained below).
- Reconnection charges waived for high-tension (HT) and low-tension (LT) consumers, and service connection charges waived for LT consumers.
- An extra 5% off the principal if your connected load is up to 20 kW and you opt for a prepaid smart meter (see the smart meter section — there is a catch worth reading).
The scheme is the latest round of MSEDCL’s Abhay Yojana. The previous round, the Amnesty Scheme 2024, ran until 31 March 2025 after an extension, and offered 10% to LT and 5% to HT consumers who paid in one go, with 30% down and the rest in six instalments. The 2026-27 round gives bigger rebates — up to 20% — but asks for 50% upfront if you choose instalments instead of a lump sum.
Who is eligible — and who is not
Eligibility is narrow, and it is worth checking before you spend time on the application. You are eligible if you meet all of these conditions:
- You are an HT or LT consumer — that covers homes, shops, offices, factories and other non-agricultural connections, both low-tension (ordinary household and small commercial supply) and high-tension (large industrial and commercial supply).
- Your supply was permanently disconnected (PD) on or before 31 March 2026 because of unpaid dues.
- Or your supply was temporarily disconnected (TD) on or before 31 December 2025 — with the conditions that the supply is physically disconnected, the TD tag is recorded in MSEDCL’s system, and there has been no consumption.
- The arrears being settled are those outstanding as on 31 March 2026.
Two special cases the circular also covers: in distribution franchisee areas, permanently disconnected consumers are eligible, as are live consumers whose arrears date from the MSEDCL period. And if you have pending litigation against MSEDCL, you can only join the scheme after unconditionally withdrawing it.
Who is not eligible:
- Agriculture consumers — farm connections are excluded entirely.
- Public Water Works (PWW) — public tap water supply schemes are excluded.
- Ordinary consumers with a live connection and an overdue bill. If your supply was never disconnected, this scheme is not for you — paying your current bill on time is the only route.
If you are unsure whether your connection is recorded as PD or TD in MSEDCL’s system, check on the official portal with your consumer number (from an old bill) before applying — or ask at your subdivision office. Do not pay anyone who claims they can “convert” your connection’s status for a fee.
How much you save: the rebate table
The 100% waiver of interest and delayed payment charges applies to every eligible consumer, whatever you choose. The rebate on the principal is separate — it depends on your consumer category, how old the arrears are, and whether you pay in one go by 15 December 2026.
| Consumer category | Arrears up to 3 years old | Arrears more than 3 years old |
|---|---|---|
| LT residential and commercial | 10% off principal | 20% off principal |
| HT residential, commercial, industrial, public services and others; LT industrial, public services and others (agriculture excluded) | 10% off principal | 15% off principal |
The rebate is an early-bird incentive: it applies only to a full lump-sum payment made on or before 15 December 2026. Pay the lump sum between 16 December 2026 and 15 January 2027 and you keep the 100% interest waiver, but the full principal is due. Choose instalments and there is no principal rebate at all — the waiver still applies, the rebate does not.
A worked example, to make the numbers concrete (an illustration, not your bill — your own figures will be shown on the portal): take an LT residential consumer with ₹80,000 in principal arrears older than three years and ₹30,000 in interest and delayed charges. The ₹30,000 is waived entirely. Pay the principal in one go by 15 December and the 20% rebate takes ₹16,000 off, leaving ₹64,000 to pay. Pay after 15 December, or in instalments, and the full ₹80,000 is due. The security deposit and other reconnection charges may be extra, on top of this.
Real cases already reported show how large the relief can be. In Dhule, a high-tension consumer, Siddhi Dehydration Pvt. Ltd., had total arrears of ₹34,61,214 and received a concession of ₹23.83 lakh after paying the principal in a single instalment. In Nagpur, a domestic consumer with dues of ₹7,190 paid the principal of ₹5,760 and had ₹1,430 of interest and late fees waived.
Lump sum or instalments: which is better
If you can arrange the money, the lump sum by 15 December 2026 is clearly the better deal — it is the only way to get the 10–20% principal rebate. But the scheme also gives an instalment route for consumers who cannot pay everything at once. The terms are different for LT and HT consumers:
- LT consumers: pay at least 50% of the principal arrears plus 100% of any legal charges within 7 days of approval. The balance is paid in up to 6 equal monthly instalments, interest-free.
- HT consumers: pay 50% of the principal arrears plus 100% of any legal charges within 7 days of approval. The balance is paid in up to 3 monthly instalments if the arrears are up to ₹50 lakh, or up to 6 if they are above ₹50 lakh, interest-free.
Three rules apply to instalments, whichever category you are in:
- No delayed payment charges are charged on approved instalments — they stay interest-free as long as you pay on schedule.
- Instalments fall due on schedule whether or not your connection has been restored. Reconnection does not pause the payment dates.
- If you do not complete payment in the approved period, the benefits are withdrawn and the delayed charges and interest are recovered. A missed instalment can cost you the whole waiver, so do not opt for instalments you cannot keep up with.
After reconnection, your current bills must be paid as usual, on top of the instalments. If the lump sum is out of reach but you can manage half now and the rest over a few months, instalments are still a good deal — the 100% interest waiver alone is usually the biggest part of the saving. Just remember: instalments mean no principal rebate, so if you are close to being able to pay in full by 15 December, it is worth trying.
How to apply on the official portal
Applications are made online only — through MSEDCL’s official portal or its mobile app. There is no offline form and no agent channel. The official portal is:
portal.mahadiscom.in/abhay_yojana/index.php — type the address yourself in your browser. Do not open it from a link in an SMS, email or WhatsApp forward.
The steps, as confirmed by the portal and MSEDCL’s guide:
- Keep your consumer number ready. Find it on an old electricity bill. You will also need to know your arrears — the portal will show the amount due, the interest to be waived and the rebate available.
- Open the official portal (address above). According to MSEDCL’s guide, it has buttons for Apply Now, Check Application Status and Pay Next Instalment.
- Apply through the portal or the MSEDCL mobile app. Fill in the details the portal asks for — your consumer number and connection details — and submit the application.
- Attach the prescribed undertaking and supporting documents. The undertaking refers to your Aadhaar card and ownership or lease documents for the premises. Keep scanned copies ready before you start.
- Wait for approval. Applications with no dispute, court case or billing complaint are approved automatically. If there is litigation, the approving authority is the Executive Engineer (O&M), Division for LT consumers, and the Chief Engineer (O&M), Zone for HT consumers.
- Pay on time. For the principal rebate, pay the full lump sum by 15 December 2026. For instalments, pay the first 50% plus legal charges within 7 days of approval, then the monthly instalments on schedule. Further instalments can be paid through the portal’s Pay Next Instalment option.
- Track your application on the same portal using Check Application Status.
If you get stuck, MSEDCL’s toll-free numbers are 1912, 19120, 1800-212-3435 and 1800-233-3435. Your subdivision office can also check your arrears and eligibility if the portal shows a figure you do not recognise — check there before applying, not after paying.
What happens after you apply
Once your application is approved and you have paid — the lump sum, or the first instalment — your connection can be restored. A few things to know about this stage:
- A valid Aadhaar card is required for reconnection.
- The security deposit, legal charges and other charges under the Supply Code and MSEDCL rules must be paid. These are separate from the arrears settlement, so budget for them.
- Reconnection will be with a smart meter only, according to the circular. The undertaking you sign also says that reconnection — or a new connection — is subject to technical feasibility.
- Reconnection charges are waived for HT and LT consumers, and service connection charges are waived for LT consumers, so those two fees should not appear in your bill.
- If MSEDCL has started legal proceedings for recovery, the legal expenses are payable on top of the scheme amount, and the proceedings are withdrawn only after all conditions are met and the amount is paid.
- If you sue MSEDCL after taking the scheme’s benefits, you lose them — the benefits are withdrawn.
District rollouts are already under way — in Akola circle alone, 2,41,092 defaulting consumers can benefit, according to MSEDCL’s Chief Engineer there. The circle’s consumers owe ₹241.07 crore in principal, on which ₹40.55 crore of interest and ₹2.95 crore of late fees will be waived. District-wise: Akola district has 69,419 consumers (₹75.40 crore principal, ₹12.29 crore interest, ₹93 lakh late fee), Buldhana has 1,10,366 (₹107.26 crore principal, ₹19.95 crore interest, ₹1.28 crore late fee) and Washim has 61,307 (₹58.41 crore principal, ₹8.29 crore interest, ₹72.52 lakh late fee). If your district has announced its own rollout, the same terms apply — the scheme is statewide, and the last date is the same everywhere.
The 5% prepaid smart meter concession — read this first
There is one more discount in the scheme, and it is genuinely in the circular — but it comes with a condition that deserves a careful read. Consumers with a connected load of up to 20 kW who opt for a prepaid smart meter get an additional 5% rebate on the payable principal arrears. The official portal lists it too: “Additional 5% rebate for prepaid smart meter.” The rebate is credited to the prepaid meter account after reconnection.
Before you tick that box, understand three things:
- Reconnection is with a smart meter only. The circular says so. So ask your subdivision office whether the prepaid smart meter is a genuine choice — and whether the 5% applies if you take a smart meter in any case. Do not assume the 5% is free money for a choice you were going to make anyway.
- A prepaid meter changes how you pay. Instead of a monthly bill after you use electricity, you pay in advance and the meter deducts as you consume — that is what “prepaid” means. Nagpur’s first prepaid connection under this scheme went to a Civil Lines resident who cleared his dues through the Abhay Yojana and then opted to manage future use through advance payments. If you are used to paying after use, this is a real change in habit, not just a discount.
- Check the credit. The 5% is credited to the prepaid meter account after reconnection — confirm on the portal or at your subdivision office that it has actually been credited, rather than assuming it.
For a small household with a load under 20 kW, the 5% can be worth having on top of the 10–20% rebate. Just make the choice with your eyes open: it is a different way of paying for electricity, not only a discount.
Common mistakes to avoid
- Paying through an agent or an unofficial link. There is no agent channel for this scheme. Apply only on portal.mahadiscom.in/abhay_yojana or the MSEDCL app. Anyone asking for a “processing fee” to get you into the scheme is running a scam.
- Assuming a live connection qualifies. It does not. Only permanently disconnected (by 31 March 2026) or temporarily disconnected (by 31 December 2025) consumers are eligible. A live connection with an overdue bill is outside the scheme.
- Missing the 15 December deadline for the rebate. The scheme itself runs to 15 January 2027, but the principal rebate ends on 15 December 2026. A lump-sum payment on 16 December gets the interest waiver only — the 10–20% is gone.
- Choosing instalments and expecting a rebate. Instalments and the principal rebate do not mix. If you pay in instalments, the principal is due in full.
- Missing an instalment date. The benefits are withdrawn and the interest and delayed charges come back. If your finances are uncertain, think twice before committing to a schedule.
- Applying while litigation is still pending. You must withdraw any case against MSEDCL unconditionally first. An application filed with a live case will not be approved.
- Sharing OTPs or bank details. MSEDCL never asks for your OTP, UPI PIN or bank password — not on the portal, not on a call. Never share them with anyone claiming to be from the department.
- Confusing this with the traffic-challan scheme. Same name, different scheme. Paying a traffic challan under the other Abhay Yojana does nothing for your electricity arrears, and vice versa.
FAQs
Who can apply for MSEDCL Abhay Yojana 2026-27?
HT and LT consumers of all categories — except agriculture and public water works — whose electricity supply was permanently disconnected on or before 31 March 2026, or temporarily disconnected on or before 31 December 2025. Ordinary consumers with a live connection are not eligible.
What exactly is waived?
100% of the interest arrears and 100% of the delayed payment charges on the outstanding arrears, including interest that built up from the date of permanent disconnection to the date you apply. Demand/fixed charges between temporary and permanent disconnection are also waived. On top of that, a lump-sum payment by 15 December 2026 earns a 10–20% rebate on the principal, and up to 20 kW consumers who opt for a prepaid smart meter get a further 5%.
What is the last date of the scheme?
The scheme runs from 6 November 2026 to 15 January 2027. But the principal rebate (10–20%) is only for full lump-sum payments made by 15 December 2026. After that date you can still join the scheme and get the interest waiver, but not the rebate.
Can I pay in instalments?
Yes. LT consumers pay at least 50% of the principal plus 100% of legal charges within 7 days of approval, and the balance in up to 6 equal monthly instalments. HT consumers pay 50% plus legal charges in 7 days, and the balance in up to 3 instalments (arrears up to ₹50 lakh) or up to 6 (above ₹50 lakh). Instalments are interest-free, but you get no principal rebate on this route, and missing the schedule cancels the benefits.
How do I apply?
On the official portal, portal.mahadiscom.in/abhay_yojana/index.php, or through the MSEDCL mobile app. Keep your consumer number, Aadhaar card and ownership/lease documents ready, and attach the prescribed undertaking. Applications with no dispute, court case or billing complaint are approved automatically.
Is this the same as the Maharashtra traffic-challan Abhay Yojana?
No. That scheme gives a discount on pending traffic challans; this one settles old electricity bills with MSEDCL. Same name, different department. See our Maharashtra e-challan amnesty guide for the traffic-fine scheme.
What documents do I need?
Your consumer number (from an old bill), a valid Aadhaar card, and ownership or lease documents for the premises, plus the prescribed undertaking the portal asks for. The security deposit and any legal charges are payable separately at reconnection.
Will my connection be restored after I pay?
Yes, once the approved amount is paid — with a smart meter, and subject to technical feasibility. Reconnection charges are waived for HT and LT consumers, and service connection charges are waived for LT consumers.
Sources
- MSEDCL — B&A Circular No. 09/2026, Ref. E/B&A/PD Amnesty/2026-27/37621, dated 4 November 2026 (official circular, PDF): mahadiscom.in
- Official Abhay Yojana 2026-27 portal (MSEDCL): portal.mahadiscom.in/abhay_yojana — scheme duration 6 Nov 2026–15 Jan 2027, early-bird rebate up to 20% before 15 Dec 2026, 100% interest & DPC waiver, additional 5% for prepaid smart meter
- My Maharashtra, 9 November 2026 — “MSEDCL Abhay Yojana 2026-27: eligibility, rebates, how to apply” (detailed guide citing the circular; rebate table, instalment slabs, TD conditions, Aadhaar and reconnection terms, worked example, toll-free numbers): mymaharashtra.in
- The DCN, November 2026 — “MSEDCL offers relief on pending power bills”: thedcn.news
- City News Mumbai — “MSEDCL’s big Diwali gift: 100% interest waived on outstanding electricity bills in Bhiwandi”: citynewsmumbai.com
- Prime Time 24, 17 November 2026 — “MSEDCL Abhay scheme waives interest, late fees for 2.41 lakh defaulters in Akola circle” (Akola circle and district figures): primetime24.com
- Urban Acres, November 2026 — “Nagpur Gets First Prepaid Electricity Meter After Arrears” (Bandu Vasudev Kumre case, via Loksatta–Nagpur): urbanacres.in
- Urban Acres, November 2026 — “Mahavitaran Abhay Yojana Waives ₹23.83 Lakh in Dhule” (Siddhi Dehydration Pvt. Ltd. case, via Loksatta): urbanacres.in
- Our guides: Maharashtra E-Challan Amnesty Scheme 2026 (post 2198) — the traffic-challan scheme, different from this one; Ujjwala Yojana Apply Online 2026 (post 2220); PM Vishwakarma Yojana (post 2421); e-Shram Card Apply Online (post 2423) — all verified live via the site connector, 20 November 2026
- Photo: “High Voltage Power Lines Against Blue Sky” by Michał Robak, Pexels photo 29550062 — pexels.com
Figures in this article are dated: the scheme terms are from MSEDCL’s B&A Circular No. 09/2026 dated 4 November 2026 and the official portal as read on 20 November 2026; the Akola figures are as reported by Prime Time 24 on 17 November 2026; the Nagpur and Dhule cases are as reported by Urban Acres (via Loksatta) in November 2026. The amount shown for your own consumer number on portal.mahadiscom.in/abhay_yojana is always final — if it differs from anything here, go by the portal and check with your subdivision office.
Disclaimer: this is a private information guide, not a government website. Scheme terms and portal steps can change — always verify on portal.mahadiscom.in or mahadiscom.in before acting. Never pay an electricity bill from a link in an SMS; use only the official portal or app, and never share your OTP, UPI PIN or bank password with anyone — the government never asks for OTPs.
Related: Maharashtra e-challan amnesty scheme 2026 (traffic fines — a different scheme), Ujjwala Yojana free LPG connection, PM Vishwakarma Yojana, and e-Shram Card apply online.
WRITTEN BY

Manish is the content curator at OnlineChallanChecker.com, a trusted platform for checking challan status, payment updates, and traffic fine information across India. With over 5 years of experience in digital content creation and online service platforms, Admin is committed to delivering accurate, easy-to-understand guides that help users manage their challans effortlessly.